Confined spaces, treatment chemicals, biological exposure and monitoring.
Search by function, activity, role or workflow action.
Browse by operating domain
Dedicated workspace
Prepare pump maintenance, link the risk assessment and applicable confined-space permit, then record inspection evidence.
Use the standard User Guide button in the topbar whenever you need help. All industry instructions are maintained here.
01START HEREYour workflow from setup to closureWho does what, in which order, and how source controls apply.
Set up access and working scope
The organization administrator selects the industry, enables available workspaces and assigns roles with organization-unit scope. Additional workspaces can be disabled from Industry workspaces; the default workspace cannot be disabled. Disabling retains records and history. Package entitlements still control available functions.
Activity workflow
Create the activity with its operating context, location, owner, planned dates and internal, contractor or mixed workforce.
Open Detail, complete the readiness checks, resolve failed checks and attach evidence that passes scanning. Use Work controls to link saved records from the correct organization unit.
Submit for review. A reviewer independent of the creator and owner approves the activity.
Start within the approved date window. Permit-required work also needs a directly linked active PTW within its validity window.
Complete the work, attach completion evidence and request verification. An independent reviewer closes it after directly linked PTW and CAPA are resolved.
Open shared modules without leaving your industry
Open your industry workspace and select the required module from the grouped menu, such as HIRARC, Permit to work, CAPA or Assets & certificates. Resources → Shared services lists the available connections.
The register opens within the industry page. Select Open workspace to review a record and follow its linked Work Package, JSA, permit or other source record in the same industry context.
Use New record, Add, Edit or Renew where available. The original form opens in a modal. Select the correct site and organization unit; registers follow the module’s filters and your authorized scope.
Save or submit through the form’s existing controls. Required evidence, assignment, status and independent approval still apply. Use Close at the upper right to dismiss the form; closing a modal does not close the business record.
Use the record’s Print / PDF control for its controlled document. Printing and downloads open separately. On mobile the same forms fill the screen, with scrollable content and accessible Close controls.
Desktop · Original HIRARC form and Close controlMobile · Same fields and actions, full-screen form
How linked controls work
Work controls shows the source record, current status, direct links and dependencies reached through a Work Package or PTW. A typed reference does not create a relationship. Activity approval does not approve a Work Package, verify LOTO or activate a permit. Follow each source record's own approval and release workflow; reopen Detail to refresh its status.
Use Add and Edit to open the permitted form. Detail holds evidence, linked records, workflow and history. On mobile, table rows become labeled cards with the same actions.
Water & Wastewater: operating workflow
Choose Water Supply & Treatment, Sewerage & Wastewater or Industrial Effluent from the topbar. The edition changes the operating focus; records, permissions and package entitlements remain shared.
Register the facility, process, network, confined space and sampling point. Link existing GIS locations and the authoritative Equipment record.
Complete the operating profile and jurisdiction screening. A reviewer assesses applicable licences, legal requirements and guidance with dated evidence. Configured limits are approved locally; no generic limit is presented as a universal legal standard.
Prepare HIRARC, JSA, Work Package and the source PTW. In Confined-space entry, assign the exact space, Equipment, accepted plan, detector and named issuer, supervisor, gas tester, attendant and entrants. Competency must cover the permit window.
Verify source LOTO and gas testing, bind the latest gas test to the exact detector, then obtain independent entry authority. Activate the source PTW before the named supervisor opens entry. The attendant records each person in and out. Changed or expired evidence blocks further entry; safe exit remains available.
Account for everyone out, request exit review and obtain independent exit verification. Complete the existing LOTO reinstatement and PTW closure workflow, then close the entry record.
Approve the sampling point and versioned parameter limits before scheduling samples. Record collection time in UTC, laboratory, exact approved method, custody and a clean report using Upload laboratory report on the scheduled sample. Link an existing Environmental Monitoring result or create one draft. Complete source approval, then an independent reviewer verifies the sample.
Numeric, qualitative and below-detection results remain distinct. Each result retains its limit revision. Changed source results require a replacement sample; historical evidence is preserved. Use Quality response to link the source result, Event and CAPA.
Failed critical asset checks restrict shared Equipment and create one scheduled maintenance record. Open the repair in Equipment and link its actual Work Package. Return-to-service requires completed source work, the closed Work Package, closed permits, verified reinstatement and independent repair assurance. Renew certificates only in Equipment.
The overview shows sampling completion, verified quality results, entry controls, restricted assets, events, six-month hours and GIS. Missing evidence is not zero performance. TRIR and LTIFR require every site-month in scope to have verified hours. All charts link to source registers.
Integration inbox accepts read-only observations and mapped draft records from SCADA, LIMS, GIS, HR/LMS and CMMS. Review staged data before creating a draft; duplicate external IDs with changed data are rejected. This does not connect to or control plant equipment. Review and sample reminders appear in the existing notification inbox when the industry scheduler runs.
02Water & WastewaterOverview, scope and navigationStart with the right operating context.
How to use this section
Open the enabled industry from the navigation rail or the mobile More menu. Expand the grouped top menu to choose the next stage of work.
Select the organization unit and available project, factory or site context. KPI cards, graphs, maps and registers reflect the scope supported by that workspace.
Follow a KPI or source link to the underlying record. A missing or incomplete reporting value is not an assumed zero.
On mobile, registers become labeled cards. Use the same Detail, Edit and permitted workflow controls from each card.
Desktop · Facility / site / operational locationMobile · Facility / site / operational location
03Water & WastewaterFacility & operating profilePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Operating profiles; WTP / STP / IETS / network / service type; Operator and asset owner; Jurisdiction; Design capacity (m³/day); Service territory and system boundary.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Facility & operating profile · Highlight: * Facility / site organization unitMobile · Facility & operating profile · Highlight: * Facility / site organization unit
04Water & WastewaterConfined spaces & rescue plansPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Confined Space ID; Classification and entry alternatives; Atmosphere, flooding and process hazards; Isolation and inflow prevention plan; Ventilation and communications; Approved rescue plan, team and retrieval arrangements; Approved gas limits, frequency and stop-work procedure; Approved O₂ minimum (%); Approved O₂ maximum (%); Approved LEL maximum (%); Approved H₂S maximum (ppm); Approved CO maximum (ppm); Maximum test age (minutes).
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Confined spaces & rescue plans · Highlight: * Facility / site organization unitMobile · Confined spaces & rescue plans · Highlight: * Facility / site organization unit
05Water & WastewaterCompetency & role authorisationPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Named worker; Responsible account; Role; Required competency course; Authorisation valid until; Facility, task and competency scope.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Competency & role authorisation · Highlight: * Facility / site organization unitMobile · Competency & role authorisation · Highlight: * Facility / site organization unit
06Water & WastewaterEntry planning & readinessPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Current confined-space assessment; Entry scope and alternatives considered; Rescue team, equipment and communications check; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Entry planning & readiness · Highlight: * Facility / site organization unitMobile · Entry planning & readiness · Highlight: * Facility / site organization unit
Entry planning & readiness
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
07Water & WastewaterGas detection & calibration assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Gases and measurement ranges; Calibration valid until; Bump test date; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Gas detection & calibration assurance · Highlight: * Facility / site organization unitMobile · Gas detection & calibration assurance · Highlight: * Facility / site organization unit
08Water & WastewaterChemical storage, delivery & dosingPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Chemical and dosing process; Compatibility, containment and transfer controls; Detection, exposure controls and emergency response; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Chemical storage, delivery & dosing · Highlight: * Facility / site organization unitMobile · Chemical storage, delivery & dosing · Highlight: * Facility / site organization unit
Chemical storage, delivery & dosing
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
09Water & WastewaterBiological exposure & hygienePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Exposed workgroups and tasks; Hygiene, PPE and decontamination arrangements; Occupational health referral basis (no clinical details); Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Biological exposure & hygiene · Highlight: * Facility / site organization unitMobile · Biological exposure & hygiene · Highlight: * Facility / site organization unit
Biological exposure & hygiene
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
10Water & WastewaterWater Safety PlanPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Catchment-to-consumer system description; Hazardous events, risk and existing barriers; Critical controls, owners and operating limits; Monitoring, verification and corrective-action programme; Review triggers and change management.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Water Safety Plan · Highlight: * Facility / site organization unitMobile · Water Safety Plan · Highlight: * Facility / site organization unit
Water Safety Plan
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
11Water & WastewaterSampling & discharge pointsPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Sampling Point ID; Water stream; Treatment stage / receiving water; Collection method and chain-of-custody requirements; Approved monitoring schedule; Facility classification and approved monitoring basis.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Sampling & discharge points · Highlight: * Facility / site organization unitMobile · Sampling & discharge points · Highlight: * Facility / site organization unit
12Water & WastewaterParameter limits & versionsPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Sampling point review; Parameter code / name; Measurement unit; Comparison; Minimum; Maximum; Effective from; Effective until; Approved analytical method; Approved limit reference and version; Basis.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Parameter limits & versions · Highlight: * Facility / site organization unitMobile · Parameter limits & versions · Highlight: * Facility / site organization unit
13Water & WastewaterWater quality deviation responsePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Affected system, parameter and public-health scope; Containment, verification and authority liaison; Source monitoring reference; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Water quality deviation response · Highlight: * Facility / site organization unitMobile · Water quality deviation response · Highlight: * Facility / site organization unit
14Water & WastewaterEffluent & treatment process assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Treatment process and discharge point; Applicable discharge classification and limit basis; Process upset, bypass prevention and escalation; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Effluent & treatment process assurance · Highlight: * Facility / site organization unitMobile · Effluent & treatment process assurance · Highlight: * Facility / site organization unit
Effluent & treatment process assurance
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
15Water & WastewaterSludge, biosolids & disposalPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Source process and sludge batch; Characterisation and classification basis; Wet / dry quantity and measurement basis; Transporter, destination and disposal evidence; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Sludge, biosolids & disposal · Highlight: * Facility / site organization unitMobile · Sludge, biosolids & disposal · Highlight: * Facility / site organization unit
Sludge, biosolids & disposal
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
16Water & WastewaterCritical asset integrityPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Equipment and process boundary; Critical defect; Inspection, calibration and examination basis; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Critical asset integrity · Highlight: * Facility / site organization unitMobile · Critical asset integrity · Highlight: * Facility / site organization unit
17Water & WastewaterMaintenance & isolation planningPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Repair target and scope; Electrical, pressure, inflow and mechanical isolation plan; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Maintenance & isolation planning · Highlight: * Facility / site organization unitMobile · Maintenance & isolation planning · Highlight: * Facility / site organization unit
Maintenance & isolation planning
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
18Water & WastewaterRepair & return-to-servicePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Independent post-repair test and reinstatement evidence; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Repair & return-to-service · Highlight: * Facility / site organization unitMobile · Repair & return-to-service · Highlight: * Facility / site organization unit
19Water & WastewaterPressure & pipeline integrityPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Network section / pipeline ID; Material, diameter and pressure / depth; Pressure test and inspection evidence; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Pressure & pipeline integrity · Highlight: * Facility / site organization unitMobile · Pressure & pipeline integrity · Highlight: * Facility / site organization unit
Pressure & pipeline integrity
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
20Water & WastewaterExcavation, network & public protectionPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Buried services and utility detection; Trench stability, access and inspections; Road opening, traffic, barriers and public access; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Excavation, network & public protection · Highlight: * Facility / site organization unitMobile · Excavation, network & public protection · Highlight: * Facility / site organization unit
Excavation, network & public protection
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
21Water & WastewaterReservoir, tank & open-water safetyPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Access, fall and drowning prevention; Rescue equipment and readiness; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Reservoir, tank & open-water safety · Highlight: * Facility / site organization unitMobile · Reservoir, tank & open-water safety · Highlight: * Facility / site organization unit
Reservoir, tank & open-water safety
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
22Water & WastewaterOverflow, contamination & public eventsPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Public, environmental and operational impact; Protection, containment, cleanup and verification; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Overflow, contamination & public events · Highlight: * Facility / site organization unitMobile · Overflow, contamination & public events · Highlight: * Facility / site organization unit
Overflow, contamination & public events
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
23Water & WastewaterProcess changes & commissioningPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Chemical, dosing, process or automation change; Technical review, tests, training and commissioning; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Process changes & commissioning · Highlight: * Facility / site organization unitMobile · Process changes & commissioning · Highlight: * Facility / site organization unit
Process changes & commissioning
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
24Water & WastewaterLaboratory safety & quality assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Methods, equipment calibration and QA evidence; Sample receipt, handling and retention; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Laboratory safety & quality assurance · Highlight: * Facility / site organization unitMobile · Laboratory safety & quality assurance · Highlight: * Facility / site organization unit
Laboratory safety & quality assurance
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
25Water & WastewaterChemical, gas, flood & rescue readinessPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Scenarios, resources and emergency contacts; Emergency response and recovery arrangements; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
26Water & WastewaterFlood, drought & continuityPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Warning sources and response triggers; Supply continuity, safe shutdown and recovery verification; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Flood, drought & continuity · Highlight: * Facility / site organization unitMobile · Flood, drought & continuity · Highlight: * Facility / site organization unit
Flood, drought & continuity
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
27Water & WastewaterWater reuse & advanced treatmentPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Reuse / RO / membrane system; Cross-connection, pressure and exposure prevention; Approved controls and operating limits; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Water reuse & advanced treatment · Highlight: * Facility / site organization unitMobile · Water reuse & advanced treatment · Highlight: * Facility / site organization unit
Water reuse & advanced treatment
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
28Water & WastewaterEnvironmental observation assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Parameter; Observed at (UTC); Measured value; Approved minimum; Approved maximum; Unit; Approved operating limit / revision.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Environmental observation assurance · Highlight: * Facility / site organization unitMobile · Environmental observation assurance · Highlight: * Facility / site organization unit
29Water & WastewaterLicences, certificates & renewalsPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Authority and licence classification; Licence / permit number; Renewal due; Applicable conditions and renewal evidence.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Licences, certificates & renewals · Highlight: * Facility / site organization unitMobile · Licences, certificates & renewals · Highlight: * Facility / site organization unit
30Water & WastewaterJurisdiction & applicabilityPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Requirement; Classification; Official source URL; Source version / effective date; Applicability; Jurisdiction, facility classification and decision basis.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Jurisdiction & applicability · Highlight: * Facility / site organization unitMobile · Jurisdiction & applicability · Highlight: * Facility / site organization unit
31Water & WastewaterRegulatory notifications & evidencePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Reportability decision; Authority and requirement; Decision basis and applicable deadline; Submission evidence reference; Submitted on.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Regulatory notifications & evidence · Highlight: * Facility / site organization unitMobile · Regulatory notifications & evidence · Highlight: * Facility / site organization unit
32Water & WastewaterVerified hours & outcomesPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Reporting month (first day); Verified hours; Recordable cases; Lost-time cases; Lost days; Workforce and case reconciliation evidence.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Verified hours & outcomes · Highlight: * Facility / site organization unitMobile · Verified hours & outcomes · Highlight: * Facility / site organization unit
33Water & WastewaterAssets, certificates, calendar and reportingUse one source record across industry views.
How to use this section
Assets & equipment is a filtered view of Equipment. Use its shared Add, Edit and Detail forms, certificate records and approval workflow.
Certificates & compliance summarizes source certificates and linked legal obligations. Amend the source record instead of entering a duplicate certificate.
All industries use Equipment Certificates & renewals: required types, PIC reminders, draft evidence, independent verification and retained replacement history. Use Maintenance & work controls for internal, contractor or mixed repair work and controlled return to service.
Use Calendar & recurring work to plan due dates. A new cycle creates a fresh draft and requires fresh readiness checks and approval.
Apply the desired scope and filters before exporting CSV or PDF. Open Action Inbox for assigned reviews and follow-up.