Water & Wastewater

Confined spaces, treatment chemicals, biological exposure and monitoring.

Search by function, activity, role or workflow action.

Browse by operating domain
Dedicated workspace

Prepare pump maintenance, link the risk assessment and applicable confined-space permit, then record inspection evidence.

Use the standard User Guide button in the topbar whenever you need help. All industry instructions are maintained here.

01START HEREYour workflow from setup to closureWho does what, in which order, and how source controls apply.

Set up access and working scope

The organization administrator selects the industry, enables available workspaces and assigns roles with organization-unit scope. Additional workspaces can be disabled from Industry workspaces; the default workspace cannot be disabled. Disabling retains records and history. Package entitlements still control available functions.

Activity workflow

  1. Create the activity with its operating context, location, owner, planned dates and internal, contractor or mixed workforce.
  2. Open Detail, complete the readiness checks, resolve failed checks and attach evidence that passes scanning. Use Work controls to link saved records from the correct organization unit.
  3. Submit for review. A reviewer independent of the creator and owner approves the activity.
  4. Start within the approved date window. Permit-required work also needs a directly linked active PTW within its validity window.
  5. Complete the work, attach completion evidence and request verification. An independent reviewer closes it after directly linked PTW and CAPA are resolved.

Open shared modules without leaving your industry

  1. Open your industry workspace and select the required module from the grouped menu, such as HIRARC, Permit to work, CAPA or Assets & certificates. Resources → Shared services lists the available connections.
  2. The register opens within the industry page. Select Open workspace to review a record and follow its linked Work Package, JSA, permit or other source record in the same industry context.
  3. Use New record, Add, Edit or Renew where available. The original form opens in a modal. Select the correct site and organization unit; registers follow the module’s filters and your authorized scope.
  4. Save or submit through the form’s existing controls. Required evidence, assignment, status and independent approval still apply. Use Close at the upper right to dismiss the form; closing a modal does not close the business record.
  5. Use the record’s Print / PDF control for its controlled document. Printing and downloads open separately. On mobile the same forms fill the screen, with scrollable content and accessible Close controls.
Actual HIRARC form opened inside the Construction workspace on desktop
Desktop · Original HIRARC form and Close control
Actual HIRARC form in a full-screen mobile modal
Mobile · Same fields and actions, full-screen form

How linked controls work

Work controls shows the source record, current status, direct links and dependencies reached through a Work Package or PTW. A typed reference does not create a relationship. Activity approval does not approve a Work Package, verify LOTO or activate a permit. Follow each source record's own approval and release workflow; reopen Detail to refresh its status.

Use Add and Edit to open the permitted form. Detail holds evidence, linked records, workflow and history. On mobile, table rows become labeled cards with the same actions.

Water & Wastewater: operating workflow

Choose Water Supply & Treatment, Sewerage & Wastewater or Industrial Effluent from the topbar. The edition changes the operating focus; records, permissions and package entitlements remain shared.

  1. Register the facility, process, network, confined space and sampling point. Link existing GIS locations and the authoritative Equipment record.
  2. Complete the operating profile and jurisdiction screening. A reviewer assesses applicable licences, legal requirements and guidance with dated evidence. Configured limits are approved locally; no generic limit is presented as a universal legal standard.
  3. Prepare HIRARC, JSA, Work Package and the source PTW. In Confined-space entry, assign the exact space, Equipment, accepted plan, detector and named issuer, supervisor, gas tester, attendant and entrants. Competency must cover the permit window.
  4. Verify source LOTO and gas testing, bind the latest gas test to the exact detector, then obtain independent entry authority. Activate the source PTW before the named supervisor opens entry. The attendant records each person in and out. Changed or expired evidence blocks further entry; safe exit remains available.
  5. Account for everyone out, request exit review and obtain independent exit verification. Complete the existing LOTO reinstatement and PTW closure workflow, then close the entry record.
  6. Approve the sampling point and versioned parameter limits before scheduling samples. Record collection time in UTC, laboratory, exact approved method, custody and a clean report using Upload laboratory report on the scheduled sample. Link an existing Environmental Monitoring result or create one draft. Complete source approval, then an independent reviewer verifies the sample.
  7. Numeric, qualitative and below-detection results remain distinct. Each result retains its limit revision. Changed source results require a replacement sample; historical evidence is preserved. Use Quality response to link the source result, Event and CAPA.
  8. Failed critical asset checks restrict shared Equipment and create one scheduled maintenance record. Open the repair in Equipment and link its actual Work Package. Return-to-service requires completed source work, the closed Work Package, closed permits, verified reinstatement and independent repair assurance. Renew certificates only in Equipment.

The overview shows sampling completion, verified quality results, entry controls, restricted assets, events, six-month hours and GIS. Missing evidence is not zero performance. TRIR and LTIFR require every site-month in scope to have verified hours. All charts link to source registers.

Integration inbox accepts read-only observations and mapped draft records from SCADA, LIMS, GIS, HR/LMS and CMMS. Review staged data before creating a draft; duplicate external IDs with changed data are rejected. This does not connect to or control plant equipment. Review and sample reminders appear in the existing notification inbox when the industry scheduler runs.

02Water & WastewaterOverview, scope and navigationStart with the right operating context.

How to use this section

  1. Open the enabled industry from the navigation rail or the mobile More menu. Expand the grouped top menu to choose the next stage of work.
  2. Select the organization unit and available project, factory or site context. KPI cards, graphs, maps and registers reflect the scope supported by that workspace.
  3. Follow a KPI or source link to the underlying record. A missing or incomplete reporting value is not an assumed zero.
  4. On mobile, registers become labeled cards. Use the same Detail, Edit and permitted workflow controls from each card.
Desktop · Facility / site / operational location
Desktop · Facility / site / operational location
Mobile · Facility / site / operational location
Mobile · Facility / site / operational location
03Water & WastewaterFacility & operating profilePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Operating profiles; WTP / STP / IETS / network / service type; Operator and asset owner; Jurisdiction; Design capacity (m³/day); Service territory and system boundary.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Facility & operating profile · Highlight: * Facility / site organization unit
Desktop · Facility & operating profile · Highlight: * Facility / site organization unit
Mobile · Facility & operating profile · Highlight: * Facility / site organization unit
Mobile · Facility & operating profile · Highlight: * Facility / site organization unit
04Water & WastewaterConfined spaces & rescue plansPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Confined Space ID; Classification and entry alternatives; Atmosphere, flooding and process hazards; Isolation and inflow prevention plan; Ventilation and communications; Approved rescue plan, team and retrieval arrangements; Approved gas limits, frequency and stop-work procedure; Approved O₂ minimum (%); Approved O₂ maximum (%); Approved LEL maximum (%); Approved H₂S maximum (ppm); Approved CO maximum (ppm); Maximum test age (minutes).
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Confined spaces & rescue plans · Highlight: * Facility / site organization unit
Desktop · Confined spaces & rescue plans · Highlight: * Facility / site organization unit
Mobile · Confined spaces & rescue plans · Highlight: * Facility / site organization unit
Mobile · Confined spaces & rescue plans · Highlight: * Facility / site organization unit
05Water & WastewaterCompetency & role authorisationPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Named worker; Responsible account; Role; Required competency course; Authorisation valid until; Facility, task and competency scope.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Competency & role authorisation · Highlight: * Facility / site organization unit
Desktop · Competency & role authorisation · Highlight: * Facility / site organization unit
Mobile · Competency & role authorisation · Highlight: * Facility / site organization unit
Mobile · Competency & role authorisation · Highlight: * Facility / site organization unit
06Water & WastewaterEntry planning & readinessPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Current confined-space assessment; Entry scope and alternatives considered; Rescue team, equipment and communications check; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Entry planning & readiness · Highlight: * Facility / site organization unit
Desktop · Entry planning & readiness · Highlight: * Facility / site organization unit
Mobile · Entry planning & readiness · Highlight: * Facility / site organization unit
Mobile · Entry planning & readiness · Highlight: * Facility / site organization unit

Entry planning & readiness

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked

A directly linked, active PTW within its validity window is required before this activity starts.

07Water & WastewaterGas detection & calibration assurancePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Gases and measurement ranges; Calibration valid until; Bump test date; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Gas detection & calibration assurance · Highlight: * Facility / site organization unit
Desktop · Gas detection & calibration assurance · Highlight: * Facility / site organization unit
Mobile · Gas detection & calibration assurance · Highlight: * Facility / site organization unit
Mobile · Gas detection & calibration assurance · Highlight: * Facility / site organization unit
08Water & WastewaterChemical storage, delivery & dosingPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Chemical and dosing process; Compatibility, containment and transfer controls; Detection, exposure controls and emergency response; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Chemical storage, delivery & dosing · Highlight: * Facility / site organization unit
Desktop · Chemical storage, delivery & dosing · Highlight: * Facility / site organization unit
Mobile · Chemical storage, delivery & dosing · Highlight: * Facility / site organization unit
Mobile · Chemical storage, delivery & dosing · Highlight: * Facility / site organization unit

Chemical storage, delivery & dosing

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
09Water & WastewaterBiological exposure & hygienePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Exposed workgroups and tasks; Hygiene, PPE and decontamination arrangements; Occupational health referral basis (no clinical details); Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Biological exposure & hygiene · Highlight: * Facility / site organization unit
Desktop · Biological exposure & hygiene · Highlight: * Facility / site organization unit
Mobile · Biological exposure & hygiene · Highlight: * Facility / site organization unit
Mobile · Biological exposure & hygiene · Highlight: * Facility / site organization unit

Biological exposure & hygiene

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
10Water & WastewaterWater Safety PlanPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Catchment-to-consumer system description; Hazardous events, risk and existing barriers; Critical controls, owners and operating limits; Monitoring, verification and corrective-action programme; Review triggers and change management.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Water Safety Plan · Highlight: * Facility / site organization unit
Desktop · Water Safety Plan · Highlight: * Facility / site organization unit
Mobile · Water Safety Plan · Highlight: * Facility / site organization unit
Mobile · Water Safety Plan · Highlight: * Facility / site organization unit

Water Safety Plan

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
11Water & WastewaterSampling & discharge pointsPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Sampling Point ID; Water stream; Treatment stage / receiving water; Collection method and chain-of-custody requirements; Approved monitoring schedule; Facility classification and approved monitoring basis.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Sampling & discharge points · Highlight: * Facility / site organization unit
Desktop · Sampling & discharge points · Highlight: * Facility / site organization unit
Mobile · Sampling & discharge points · Highlight: * Facility / site organization unit
Mobile · Sampling & discharge points · Highlight: * Facility / site organization unit
12Water & WastewaterParameter limits & versionsPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Sampling point review; Parameter code / name; Measurement unit; Comparison; Minimum; Maximum; Effective from; Effective until; Approved analytical method; Approved limit reference and version; Basis.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Parameter limits & versions · Highlight: * Facility / site organization unit
Desktop · Parameter limits & versions · Highlight: * Facility / site organization unit
Mobile · Parameter limits & versions · Highlight: * Facility / site organization unit
Mobile · Parameter limits & versions · Highlight: * Facility / site organization unit
13Water & WastewaterWater quality deviation responsePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Affected system, parameter and public-health scope; Containment, verification and authority liaison; Source monitoring reference; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Water quality deviation response · Highlight: * Facility / site organization unit
Desktop · Water quality deviation response · Highlight: * Facility / site organization unit
Mobile · Water quality deviation response · Highlight: * Facility / site organization unit
Mobile · Water quality deviation response · Highlight: * Facility / site organization unit
14Water & WastewaterEffluent & treatment process assurancePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Treatment process and discharge point; Applicable discharge classification and limit basis; Process upset, bypass prevention and escalation; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Effluent & treatment process assurance · Highlight: * Facility / site organization unit
Desktop · Effluent & treatment process assurance · Highlight: * Facility / site organization unit
Mobile · Effluent & treatment process assurance · Highlight: * Facility / site organization unit
Mobile · Effluent & treatment process assurance · Highlight: * Facility / site organization unit

Effluent & treatment process assurance

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
15Water & WastewaterSludge, biosolids & disposalPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Source process and sludge batch; Characterisation and classification basis; Wet / dry quantity and measurement basis; Transporter, destination and disposal evidence; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Sludge, biosolids & disposal · Highlight: * Facility / site organization unit
Desktop · Sludge, biosolids & disposal · Highlight: * Facility / site organization unit
Mobile · Sludge, biosolids & disposal · Highlight: * Facility / site organization unit
Mobile · Sludge, biosolids & disposal · Highlight: * Facility / site organization unit

Sludge, biosolids & disposal

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
16Water & WastewaterCritical asset integrityPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Equipment and process boundary; Critical defect; Inspection, calibration and examination basis; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Critical asset integrity · Highlight: * Facility / site organization unit
Desktop · Critical asset integrity · Highlight: * Facility / site organization unit
Mobile · Critical asset integrity · Highlight: * Facility / site organization unit
Mobile · Critical asset integrity · Highlight: * Facility / site organization unit
17Water & WastewaterMaintenance & isolation planningPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Repair target and scope; Electrical, pressure, inflow and mechanical isolation plan; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Maintenance & isolation planning · Highlight: * Facility / site organization unit
Desktop · Maintenance & isolation planning · Highlight: * Facility / site organization unit
Mobile · Maintenance & isolation planning · Highlight: * Facility / site organization unit
Mobile · Maintenance & isolation planning · Highlight: * Facility / site organization unit

Maintenance & isolation planning

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked

A directly linked, active PTW within its validity window is required before this activity starts.

18Water & WastewaterRepair & return-to-servicePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Independent post-repair test and reinstatement evidence; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Repair & return-to-service · Highlight: * Facility / site organization unit
Desktop · Repair & return-to-service · Highlight: * Facility / site organization unit
Mobile · Repair & return-to-service · Highlight: * Facility / site organization unit
Mobile · Repair & return-to-service · Highlight: * Facility / site organization unit
19Water & WastewaterPressure & pipeline integrityPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Network section / pipeline ID; Material, diameter and pressure / depth; Pressure test and inspection evidence; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Pressure & pipeline integrity · Highlight: * Facility / site organization unit
Desktop · Pressure & pipeline integrity · Highlight: * Facility / site organization unit
Mobile · Pressure & pipeline integrity · Highlight: * Facility / site organization unit
Mobile · Pressure & pipeline integrity · Highlight: * Facility / site organization unit

Pressure & pipeline integrity

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked

A directly linked, active PTW within its validity window is required before this activity starts.

20Water & WastewaterExcavation, network & public protectionPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Buried services and utility detection; Trench stability, access and inspections; Road opening, traffic, barriers and public access; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Excavation, network & public protection · Highlight: * Facility / site organization unit
Desktop · Excavation, network & public protection · Highlight: * Facility / site organization unit
Mobile · Excavation, network & public protection · Highlight: * Facility / site organization unit
Mobile · Excavation, network & public protection · Highlight: * Facility / site organization unit

Excavation, network & public protection

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked

A directly linked, active PTW within its validity window is required before this activity starts.

21Water & WastewaterReservoir, tank & open-water safetyPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Access, fall and drowning prevention; Rescue equipment and readiness; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Reservoir, tank & open-water safety · Highlight: * Facility / site organization unit
Desktop · Reservoir, tank & open-water safety · Highlight: * Facility / site organization unit
Mobile · Reservoir, tank & open-water safety · Highlight: * Facility / site organization unit
Mobile · Reservoir, tank & open-water safety · Highlight: * Facility / site organization unit

Reservoir, tank & open-water safety

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked

A directly linked, active PTW within its validity window is required before this activity starts.

22Water & WastewaterOverflow, contamination & public eventsPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Public, environmental and operational impact; Protection, containment, cleanup and verification; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Overflow, contamination & public events · Highlight: * Facility / site organization unit
Desktop · Overflow, contamination & public events · Highlight: * Facility / site organization unit
Mobile · Overflow, contamination & public events · Highlight: * Facility / site organization unit
Mobile · Overflow, contamination & public events · Highlight: * Facility / site organization unit

Overflow, contamination & public events

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
23Water & WastewaterProcess changes & commissioningPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Chemical, dosing, process or automation change; Technical review, tests, training and commissioning; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Process changes & commissioning · Highlight: * Facility / site organization unit
Desktop · Process changes & commissioning · Highlight: * Facility / site organization unit
Mobile · Process changes & commissioning · Highlight: * Facility / site organization unit
Mobile · Process changes & commissioning · Highlight: * Facility / site organization unit

Process changes & commissioning

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked

A directly linked, active PTW within its validity window is required before this activity starts.

24Water & WastewaterLaboratory safety & quality assurancePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Methods, equipment calibration and QA evidence; Sample receipt, handling and retention; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Laboratory safety & quality assurance · Highlight: * Facility / site organization unit
Desktop · Laboratory safety & quality assurance · Highlight: * Facility / site organization unit
Mobile · Laboratory safety & quality assurance · Highlight: * Facility / site organization unit
Mobile · Laboratory safety & quality assurance · Highlight: * Facility / site organization unit

Laboratory safety & quality assurance

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
25Water & WastewaterChemical, gas, flood & rescue readinessPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Scenarios, resources and emergency contacts; Emergency response and recovery arrangements; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Chemical, gas, flood & rescue readiness · Highlight: * Facility / site organization unit
Desktop · Chemical, gas, flood & rescue readiness · Highlight: * Facility / site organization unit
Mobile · Chemical, gas, flood & rescue readiness · Highlight: * Facility / site organization unit
Mobile · Chemical, gas, flood & rescue readiness · Highlight: * Facility / site organization unit
26Water & WastewaterFlood, drought & continuityPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Warning sources and response triggers; Supply continuity, safe shutdown and recovery verification; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Flood, drought & continuity · Highlight: * Facility / site organization unit
Desktop · Flood, drought & continuity · Highlight: * Facility / site organization unit
Mobile · Flood, drought & continuity · Highlight: * Facility / site organization unit
Mobile · Flood, drought & continuity · Highlight: * Facility / site organization unit

Flood, drought & continuity

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
27Water & WastewaterWater reuse & advanced treatmentPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Reuse / RO / membrane system; Cross-connection, pressure and exposure prevention; Approved controls and operating limits; Verification result.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Water reuse & advanced treatment · Highlight: * Facility / site organization unit
Desktop · Water reuse & advanced treatment · Highlight: * Facility / site organization unit
Mobile · Water reuse & advanced treatment · Highlight: * Facility / site organization unit
Mobile · Water reuse & advanced treatment · Highlight: * Facility / site organization unit

Water reuse & advanced treatment

Record these details: Task boundary and approved procedure · Approved work window / coordination reference

Readiness checks

  • Current HIRARC / JSA checked
  • Competency and employer authority verified
  • Current asset and operating evidence checked
28Water & WastewaterEnvironmental observation assurancePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Parameter; Observed at (UTC); Measured value; Approved minimum; Approved maximum; Unit; Approved operating limit / revision.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Environmental observation assurance · Highlight: * Facility / site organization unit
Desktop · Environmental observation assurance · Highlight: * Facility / site organization unit
Mobile · Environmental observation assurance · Highlight: * Facility / site organization unit
Mobile · Environmental observation assurance · Highlight: * Facility / site organization unit
29Water & WastewaterLicences, certificates & renewalsPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Authority and licence classification; Licence / permit number; Renewal due; Applicable conditions and renewal evidence.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Licences, certificates & renewals · Highlight: * Facility / site organization unit
Desktop · Licences, certificates & renewals · Highlight: * Facility / site organization unit
Mobile · Licences, certificates & renewals · Highlight: * Facility / site organization unit
Mobile · Licences, certificates & renewals · Highlight: * Facility / site organization unit
30Water & WastewaterJurisdiction & applicabilityPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Requirement; Classification; Official source URL; Source version / effective date; Applicability; Jurisdiction, facility classification and decision basis.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Jurisdiction & applicability · Highlight: * Facility / site organization unit
Desktop · Jurisdiction & applicability · Highlight: * Facility / site organization unit
Mobile · Jurisdiction & applicability · Highlight: * Facility / site organization unit
Mobile · Jurisdiction & applicability · Highlight: * Facility / site organization unit
31Water & WastewaterRegulatory notifications & evidencePrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Reportability decision; Authority and requirement; Decision basis and applicable deadline; Submission evidence reference; Submitted on.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Regulatory notifications & evidence · Highlight: * Facility / site organization unit
Desktop · Regulatory notifications & evidence · Highlight: * Facility / site organization unit
Mobile · Regulatory notifications & evidence · Highlight: * Facility / site organization unit
Mobile · Regulatory notifications & evidence · Highlight: * Facility / site organization unit
32Water & WastewaterVerified hours & outcomesPrepare a source-linked assurance record and obtain independent acceptance.

How to use this section

  1. Select the operating context, owner and review due date. Record: Reporting month (first day); Verified hours; Recordable cases; Lost-time cases; Lost days; Workforce and case reconciliation evidence.
  2. Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
  3. Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
  4. Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Verified hours & outcomes · Highlight: * Facility / site organization unit
Desktop · Verified hours & outcomes · Highlight: * Facility / site organization unit
Mobile · Verified hours & outcomes · Highlight: * Facility / site organization unit
Mobile · Verified hours & outcomes · Highlight: * Facility / site organization unit
33Water & WastewaterAssets, certificates, calendar and reportingUse one source record across industry views.

How to use this section

  1. Assets & equipment is a filtered view of Equipment. Use its shared Add, Edit and Detail forms, certificate records and approval workflow.
  2. Certificates & compliance summarizes source certificates and linked legal obligations. Amend the source record instead of entering a duplicate certificate.
  3. All industries use Equipment Certificates & renewals: required types, PIC reminders, draft evidence, independent verification and retained replacement history. Use Maintenance & work controls for internal, contractor or mixed repair work and controlled return to service.
  4. Use Calendar & recurring work to plan due dates. A new cycle creates a fresh draft and requires fresh readiness checks and approval.
  5. Apply the desired scope and filters before exporting CSV or PDF. Open Action Inbox for assigned reviews and follow-up.

Open the illustrated source guide

CONNECTED HSE MODULES

These links open instructions in this same User Guide. Keep assets, permits, risk assessments and corrective actions in their owning modules.

NEED HELP?

Share the record reference, workspace URL and displayed error reference.

Do not include restricted medical, identity or personal data in a support request.