Power Generation, Transmission & Distribution, Renewable Energy & Storage with shared HSE source records.
Search by function, activity, role or workflow action.
Browse by operating domain
Dedicated workspace
Plan a controlled electrical job; verify named authorities and source isolation, clear all work parties, independently authorise restoration and close source LOTO/PTW.
Use the standard User Guide button in the topbar whenever you need help. All industry instructions are maintained here.
01START HEREYour workflow from setup to closureWho does what, in which order, and how source controls apply.
Set up access and working scope
The organization administrator selects the industry, enables available workspaces and assigns roles with organization-unit scope. Additional workspaces can be disabled from Industry workspaces; the default workspace cannot be disabled. Disabling retains records and history. Package entitlements still control available functions.
Activity workflow
Create the activity with its operating context, location, owner, planned dates and internal, contractor or mixed workforce.
Open Detail, complete the readiness checks, resolve failed checks and attach evidence that passes scanning. Use Work controls to link saved records from the correct organization unit.
Submit for review. A reviewer independent of the creator and owner approves the activity.
Start within the approved date window. Permit-required work also needs a directly linked active PTW within its validity window.
Complete the work, attach completion evidence and request verification. An independent reviewer closes it after directly linked PTW and CAPA are resolved.
Open shared modules without leaving your industry
Open your industry workspace and select the required module from the grouped menu, such as HIRARC, Permit to work, CAPA or Assets & certificates. Resources → Shared services lists the available connections.
The register opens within the industry page. Select Open workspace to review a record and follow its linked Work Package, JSA, permit or other source record in the same industry context.
Use New record, Add, Edit or Renew where available. The original form opens in a modal. Select the correct site and organization unit; registers follow the module’s filters and your authorized scope.
Save or submit through the form’s existing controls. Required evidence, assignment, status and independent approval still apply. Use Close at the upper right to dismiss the form; closing a modal does not close the business record.
Use the record’s Print / PDF control for its controlled document. Printing and downloads open separately. On mobile the same forms fill the screen, with scrollable content and accessible Close controls.
Desktop · Original HIRARC form and Close controlMobile · Same fields and actions, full-screen form
How linked controls work
Work controls shows the source record, current status, direct links and dependencies reached through a Work Package or PTW. A typed reference does not create a relationship. Activity approval does not approve a Work Package, verify LOTO or activate a permit. Follow each source record's own approval and release workflow; reopen Detail to refresh its status.
Use Add and Edit to open the permitted form. Detail holds evidence, linked records, workflow and history. On mobile, table rows become labeled cards with the same actions.
Energy & Power Utilities
Choose Power Generation, Transmission & Distribution, or Renewable Energy & Storage in the top bar. All three editions share Equipment, certificates, Work Packages, HIRARC, JSA, PTW, LOTO, competency, inspections, events and CAPA.
Create the station, systems, circuits and GIS locations. Link existing Equipment and review voltage, drawings, boundaries and criticality.
Verify competency and the employer’s named issuer, receiver, switching and verifier authorisations for the exact location, voltage and period.
Prepare the switching programme and review actual source LOTO evidence. Plan the electrical job against its exact Work Package and PTW.
The named issuer authorises; the receiver starts only with an active PTW and current controls. Record completion and sign off all permit work parties, then request PTW closure.
The independent verifier checks post-work tests. A different switching authority records restoration clearance. Every job sharing the isolation must be cleared.
Restore and independently verify the source LOTO, close PTW and the electrical job, then complete Equipment repair and return-to-service where required.
Expired or changed source evidence requires reassessment. HSE.my records authorised decisions; actual switching follows the operator’s approved procedures. External imports cannot issue commands or approvals. Use a new revision to renew evidence, preserving the original history.
Applicability is assessed separately for Peninsular Malaysia/Labuan, Sabah and Sarawak. Review current official sources, licence conditions and the installation scope. Dashboard percentages use current independently reviewed records; missing hours suppress injury rates.
02Energy & Power UtilitiesOverview, scope and navigationStart with the right operating context.
How to use this section
Open the enabled industry from the navigation rail or the mobile More menu. Expand the grouped top menu to choose the next stage of work.
Select the organization unit and available project, factory or site context. KPI cards, graphs, maps and registers reflect the scope supported by that workspace.
Follow a KPI or source link to the underlying record. A missing or incomplete reporting value is not an assumed zero.
On mobile, registers become labeled cards. Use the same Detail, Edit and permitted workflow controls from each card.
Desktop · Station / site / operational locationMobile · Station / site / operational location
03Energy & Power UtilitiesFacility, jurisdiction & operating scopePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Operating profiles; Electricity jurisdiction; Operator / licence holder; Regulated activity and technology; Facility boundaries, ownership and engineering-system references; Technical authority and emergency contacts.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Facility, jurisdiction & operating scope · Highlight: * Station / site organization unitMobile · Facility, jurisdiction & operating scope · Highlight: * Station / site organization unit
04Energy & Power UtilitiesElectrical asset & connectivity assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Operating voltage (kV); Rated capacity and unit; System, circuit / feeder and topology reference; Approved single-line diagram and revision; Earthing arrangement and operating authority; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Electrical asset & connectivity assurance · Highlight: * Station / site organization unitMobile · Electrical asset & connectivity assurance · Highlight: * Station / site organization unit
05Energy & Power UtilitiesElectrical competency & employer authorisationPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Existing employee / contractor; Required competency course; Authorised role; Maximum authorised voltage (kV); Employer authorisation valid until; Permitted equipment, work class and restrictions; Verification result; Named account for contractor actions; Credential grade / category.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Electrical competency & employer authorisation · Highlight: * Station / site organization unitMobile · Electrical competency & employer authorisation · Highlight: * Station / site organization unit
06Energy & Power UtilitiesSwitching programme assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Approved operating programme reference; Programme revision; Affected equipment, sources and work boundary; Control-room / network authority reference; Affected permits, parties and restoration dependencies; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Switching programme assurance · Highlight: * Station / site organization unitMobile · Switching programme assurance · Highlight: * Station / site organization unit
07Energy & Power UtilitiesIsolation, earths & verificationPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Accepted switching programme; Authorised field verification reference; Controlled earths / locks / tags register; Verified isolation scope and remaining sources; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Isolation, earths & verification · Highlight: * Station / site organization unitMobile · Isolation, earths & verification · Highlight: * Station / site organization unit
Isolation, earths & verification
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
08Energy & Power UtilitiesOutage & shutdown coordinationPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Approved outage reference; Start (UTC); End (UTC); Work groups, affected equipment and dependencies; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Outage & shutdown coordination · Highlight: * Station / site organization unitMobile · Outage & shutdown coordination · Highlight: * Station / site organization unit
09Energy & Power UtilitiesArc flash & electric shock assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Approved engineering study and revision; Study review due; Equipment labels and approved boundaries reference; Approved PPE and insulated-tool references; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Approved study revision; Validated incident energy and units; Validated shock / arc boundaries; Insulated tool inspection / test references.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Arc flash & electric shock assurance · Highlight: * Station / site organization unitMobile · Arc flash & electric shock assurance · Highlight: * Station / site organization unit
10Energy & Power UtilitiesProtection, earthing & test assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Test type and applicable standard; Approved test report and instrument references; Test date; Next test / review due; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Protection, earthing & test assurance · Highlight: * Station / site organization unitMobile · Protection, earthing & test assurance · Highlight: * Station / site organization unit
11Energy & Power UtilitiesCritical equipment & defect assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Critical defect identified; Condition, safeguards and defect details; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Critical equipment & defect assurance · Highlight: * Station / site organization unitMobile · Critical equipment & defect assurance · Highlight: * Station / site organization unit
12Energy & Power UtilitiesRepair & return-to-service reviewPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Repair completion and independent verification evidence; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Repair & return-to-service review · Highlight: * Station / site organization unitMobile · Repair & return-to-service review · Highlight: * Station / site organization unit
13Energy & Power UtilitiesCommissioning & energisation readinessPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Accepted protection / test assurance; Approved as-built / handover revision; Outstanding items and disposition; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Commissioning & energisation readiness · Highlight: * Station / site organization unitMobile · Commissioning & energisation readiness · Highlight: * Station / site organization unit
Commissioning & energisation readiness
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
14Energy & Power UtilitiesEngineering change assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Protection, equipment or operating change; Affected drawings, procedures and authorisations; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Engineering change assurance · Highlight: * Station / site organization unitMobile · Engineering change assurance · Highlight: * Station / site organization unit
15Energy & Power UtilitiesGeneration process & fuel safetyPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Turbine, boiler, pressure and fuel boundary; Thermal, pressure, rotating equipment and fuel safeguards; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Fuel, boiler and pressure-system boundaries; Turbine / rotating equipment safeguards.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Generation process & fuel safety · Highlight: * Station / site organization unitMobile · Generation process & fuel safety · Highlight: * Station / site organization unit
Generation process & fuel safety
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
16Energy & Power UtilitiesLinework, height & rescuePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Tower / pole / span and access reference; Access, fall protection and approved rescue arrangement; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Height / rescue competency and equipment; Adjacent live circuits and approach limits.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Linework, height & rescue · Highlight: * Station / site organization unitMobile · Linework, height & rescue · Highlight: * Station / site organization unit
Linework, height & rescue
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
17Energy & Power UtilitiesUnderground cable & excavationPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Cable route and verified utility reference; Utility interfaces, excavation boundaries and supervision; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Cable locator / drawing / trial-hole verification; Third-party utility clearance.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Underground cable & excavation · Highlight: * Station / site organization unitMobile · Underground cable & excavation · Highlight: * Station / site organization unit
Underground cable & excavation
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
18Energy & Power UtilitiesRight-of-way & vegetationPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Corridor / wayleave and land access reference; Encroachment, vegetation, third-party and environmental controls; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Encroachment / vegetation location and clearance.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Right-of-way & vegetation · Highlight: * Station / site organization unitMobile · Right-of-way & vegetation · Highlight: * Station / site organization unit
Right-of-way & vegetation
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
19Energy & Power UtilitiesPublic electrical safetyPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Public interface, affected location and hazard; Access restrictions, response and verified hazard resolution; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Fallen conductor / exposed cable / damaged pole; Public exclusion, warning and emergency response.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Public electrical safety · Highlight: * Station / site organization unitMobile · Public electrical safety · Highlight: * Station / site organization unit
Public electrical safety
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
20Energy & Power UtilitiesSolar PV & inverter safetyPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: PV string / inverter / rooftop reference; DC and AC sources, access, weather and approved safeguards; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; DC strings and inverter isolation boundaries; Roof access / fall protection / rescue reference.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Solar PV & inverter safety · Highlight: * Station / site organization unitMobile · Solar PV & inverter safety · Highlight: * Station / site organization unit
Solar PV & inverter safety
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
21Energy & Power UtilitiesBESS & thermal-event readinessPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Chemistry, MW/MWh, container and BMS reference; Fire, gas detection, cooling, separation and emergency safeguards; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Battery chemistry; Rated power (kW); Storage capacity (kWh); Container / module asset references; BMS / gas / cooling alarm state; Fire suppression, separation and emergency isolation.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · BESS & thermal-event readiness · Highlight: * Station / site organization unitMobile · BESS & thermal-event readiness · Highlight: * Station / site organization unit
BESS & thermal-event readiness
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
22Energy & Power UtilitiesHydro, dam & water-release assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Dam / reservoir / gate and approved engineering reference; Inspection, public warning, flood and water-release coordination; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Reservoir / spillway operating boundary; Flood warning and downstream interface test.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Hydro, dam & water-release assurance · Highlight: * Station / site organization unitMobile · Hydro, dam & water-release assurance · Highlight: * Station / site organization unit
Hydro, dam & water-release assurance
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
23Energy & Power UtilitiesWind turbine & rescue readinessPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Turbine / nacelle and access reference; Height, mechanical energy, weather and approved rescue controls; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Tower rescue and weather limits reference; Rotor / brake / stored-energy controls.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Wind turbine & rescue readiness · Highlight: * Station / site organization unitMobile · Wind turbine & rescue readiness · Highlight: * Station / site organization unit
Wind turbine & rescue readiness
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
A directly linked, active PTW within its validity window is required before this activity starts.
24Energy & Power UtilitiesEV charging safetyPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Charger identity, rating and protection reference; Public access, defects, inspection and emergency arrangements; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Connector and charging interface; RCD / earth-fault and emergency stop test.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · EV charging safety · Highlight: * Station / site organization unitMobile · EV charging safety · Highlight: * Station / site organization unit
EV charging safety
Record these details: Task boundary and approved procedure · Approved work window / coordination reference
Readiness checks
Current HIRARC / JSA checked
Competency and employer authority verified
Current asset and operating evidence checked
25Energy & Power UtilitiesElectrical rescue & emergency readinessPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Scenario and approved response plan; Rescue resources, teams and external interfaces; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Electrical rescue & emergency readiness · Highlight: * Station / site organization unitMobile · Electrical rescue & emergency readiness · Highlight: * Station / site organization unit
26Energy & Power UtilitiesEnvironmental & technical observationsPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Parameter and method; Observed at (UTC); Measured value; Approved minimum; Approved maximum; Unit; Approved limit and revision; Response and evidence.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Environmental & technical observations · Highlight: * Station / site organization unitMobile · Environmental & technical observations · Highlight: * Station / site organization unit
27Energy & Power UtilitiesEmissions, waste & environmental conditionsPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Emission, effluent, waste, spill or approval condition; Applicable conditions, monitoring and disposal references; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Emissions, waste & environmental conditions · Highlight: * Station / site organization unitMobile · Emissions, waste & environmental conditions · Highlight: * Station / site organization unit
28Energy & Power UtilitiesEnergy management & carbon evidencePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Assessed energy-management scope; Energy baseline, period and units; Energy manager, audit and submission references; Carbon calculation method, factors and version; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result; Assigned energy manager / credential source; Assessed reporting deadline.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Energy management & carbon evidence · Highlight: * Station / site organization unitMobile · Energy management & carbon evidence · Highlight: * Station / site organization unit
29Energy & Power UtilitiesInstallation, licence & renewalPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Issuing authority; Licence / registration reference; Applicable installation and conditions; Renewal / review due; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Installation, licence & renewal · Highlight: * Station / site organization unitMobile · Installation, licence & renewal · Highlight: * Station / site organization unit
30Energy & Power UtilitiesElectrical Safety Management PlanPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Approved plan and revision; Authority, competencies, risk, inspection and audit programme; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Electrical Safety Management Plan · Highlight: * Station / site organization unitMobile · Electrical Safety Management Plan · Highlight: * Station / site organization unit
31Energy & Power UtilitiesGrid / distribution code assurancePrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Applicable code and revision; Licence / connection obligations and test evidence; Approved procedure and revision; Acceptance criteria, verification evidence and responsible authority; Verification result.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Grid / distribution code assurance · Highlight: * Station / site organization unitMobile · Grid / distribution code assurance · Highlight: * Station / site organization unit
32Energy & Power UtilitiesIncident notification & authority submissionPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Authority / reporting channel; Reportability decision; Applicable provision, criteria and assessment; Assessed deadline; Submission / acknowledgement reference; Submitted on.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Incident notification & authority submission · Highlight: * Station / site organization unitMobile · Incident notification & authority submission · Highlight: * Station / site organization unit
33Energy & Power UtilitiesJurisdiction & obligation applicabilityPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Requirement; Legal force; Official source; Source revision / effective date; Applicability decision; Facility, jurisdiction and activity assessment.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Jurisdiction & obligation applicability · Highlight: * Station / site organization unitMobile · Jurisdiction & obligation applicability · Highlight: * Station / site organization unit
34Energy & Power UtilitiesVerified exposure & outcomesPrepare a source-linked assurance record and obtain independent acceptance.
How to use this section
Select the operating context, owner and review due date. Record: Month (first day); Verified workforce hours; Occupational recordable cases; Lost-time cases; Lost days; Reconciled workforce evidence; public cases excluded.
Link the relevant saved source records and any required accepted dependencies. Save the draft and attach supporting evidence in Detail.
Submit for independent review; resolve rejected or incomplete evidence before resubmitting. Acceptance does not approve or release the linked source work.
Use a new revision for changes to accepted records. Follow source links to resolve expired evidence, changed sources or failed prerequisites before progressing work.
Desktop · Verified exposure & outcomes · Highlight: * Station / site organization unitMobile · Verified exposure & outcomes · Highlight: * Station / site organization unit
35Energy & Power UtilitiesAssets, certificates, calendar and reportingUse one source record across industry views.
How to use this section
Assets & equipment is a filtered view of Equipment. Use its shared Add, Edit and Detail forms, certificate records and approval workflow.
Certificates & compliance summarizes source certificates and linked legal obligations. Amend the source record instead of entering a duplicate certificate.
All industries use Equipment Certificates & renewals: required types, PIC reminders, draft evidence, independent verification and retained replacement history. Use Maintenance & work controls for internal, contractor or mixed repair work and controlled return to service.
Use Calendar & recurring work to plan due dates. A new cycle creates a fresh draft and requires fresh readiness checks and approval.
Apply the desired scope and filters before exporting CSV or PDF. Open Action Inbox for assigned reviews and follow-up.